📉 Nikkei is down nearly 5% -> here are 43 recession-proof Japanese stocks from our screenerUnlock Now

Botala Energy granted environmental approval for development of Naledi CBM project in Botswana

Published 23/01/2024, 11:12 am
© Reuters.  Botala Energy granted environmental approval for development of Naledi CBM project in Botswana
BTE
-

Botala Energy Ltd (ASX:BTE) has passed a critical milestone in the development of the Naledi coal bed methane (CBM) gas project at Serowe, Botswana, having received the necessary environmental approvals.

The way is now clear for BTE to apply for a Mining Licence over the project, with applications already in progress.

“Awarding of Environmental Approval is always a major milestone for any project,” Botala Energy CEO Kris Martinick said.

“It reduces the number of remaining hurdles for development of this project. We are excited to have recommenced operations after a well-earned break across the Christmas period.”

Planned development of Project Naledi

The Naledi CBM Project sits close to the village of Serowe in Botswana.

The recently granted environmental approvals for this project include a 100-kilometre pipeline from the wellfield to a proposed energy hub (Leupane) and industrial park near the town of Palapye.

The development of the project will consist of:

  • Well heads and gas gathering network of subsurface pipes connected to the Central Processing Facility within the wellfield for removal of water and impurities.
  • Gas supply to the proposed 20-megawatt gas/solar hybrid pilot in Serowe, currently under advanced planning.
  • Gas being compressed into an export pipeline to the proposed Leupane Energy Hub and Industrial Park.
  • Water disposal from evaporation ponds; a reverse osmosis plant to treat saline water is under consideration.
  • Network of infield pipelines and service tracks.

The company’s feasibility study is also nearing completion and the mining licence for Naledi is expected to be awarded this month.

Project Pitse update

Botala is also advancing the nearby Pitse Project, its maiden commercial well pilot, where the company is preparing to collect core samples from three intersected seams in the fifth and final well of the project’s current exploration phase, Serowe-3.4.

Once the cores have been retrieved, the company will complete the other four wells.

Surface and downhole equipment from Brisbane has started to arrive in Botswana with the final containers due to land in Durban within the next two weeks.

Botala is seeking to improve its understanding of the geological setting and lithology of the greater Pitse area with ground magnetics and Audio Magnetotellurics (AMT) lines over three ‘slim’ exploration holes, which are not designed for production.

Read more on Proactive Investors AU

Disclaimer

Latest comments

Risk Disclosure: Trading in financial instruments and/or cryptocurrencies involves high risks including the risk of losing some, or all, of your investment amount, and may not be suitable for all investors. Prices of cryptocurrencies are extremely volatile and may be affected by external factors such as financial, regulatory or political events. Trading on margin increases the financial risks.
Before deciding to trade in financial instrument or cryptocurrencies you should be fully informed of the risks and costs associated with trading the financial markets, carefully consider your investment objectives, level of experience, and risk appetite, and seek professional advice where needed.
Fusion Media would like to remind you that the data contained in this website is not necessarily real-time nor accurate. The data and prices on the website are not necessarily provided by any market or exchange, but may be provided by market makers, and so prices may not be accurate and may differ from the actual price at any given market, meaning prices are indicative and not appropriate for trading purposes. Fusion Media and any provider of the data contained in this website will not accept liability for any loss or damage as a result of your trading, or your reliance on the information contained within this website.
It is prohibited to use, store, reproduce, display, modify, transmit or distribute the data contained in this website without the explicit prior written permission of Fusion Media and/or the data provider. All intellectual property rights are reserved by the providers and/or the exchange providing the data contained in this website.
Fusion Media may be compensated by the advertisers that appear on the website, based on your interaction with the advertisements or advertisers.
© 2007-2024 - Fusion Media Limited. All Rights Reserved.