SEOUL, April 7 (Reuters) - Korea Western Power Co Ltd (WP) KRPOWE.UL is seeking 220,000 tonnes of steaming coal with minimum net calorific value of 5,200kcal/kg for loading between May and July via a spot tender, the utility said on its website (http://www.westernpower.co.kr/eng).
The tender will close at 11 a.m. (0200 GMT) on April 14.
Details are as follows:
TONNES(M/T) LOADING PORT
LOADING SCHEDULE
110,000
Australia, Canada, South Africa June 1-15
Indonesia
May 15-31
110,000
Australia, Canada
June 15-30
South Africa
June 20-July 10
Indonesia
June 1-15