April 22 (Reuters) - MMG Ltd 1208.HK :
* FULL YEAR PRODUCTION FOR 2021 IS STILL EXPECTED TO BE BETWEEN 310,000 AND 330,000 TONNES OF COPPER IN COPPER CONCENTRATE
* C1 COST GUIDANCE REMAINS AT US$1.10-1.20/LB FOR 2021
* HIGHER PRODUCTION RATES FOR BOTH LAS BAMBAS AND KINSEVERE ARE EXPECTED IN SECOND HALF OF 2021 AND FULL YEAR
* Q1 TOTAL ZINC PRODUCTION 68,399 TONNES, UP 29%
* QTRLY TOTAL COPPER PRODUCTION 77,328 TONNES, DOWN 16%
* SEES COPPER CATHODE PRODUCTION FOR 2021 OF 50,000 TO 60,000 TONNES
* DUGALD RIVER EXPECTED TO PRODUCE 180,000-190,000 TONNES OF ZINC IN ZINC CONCENTRATE IN 2021
* Q1 TOTAL COPPER CATHODE PRODUCTION 12,490 TONNES, DOWN 31%